Drive past two jobsites on the same morning. One's got a tower crane climbing out of the slab. The other's got a rough-terrain mobile crane parked on a laydown pad with a stack of steel next to it. Different machine, different stage, different reason to pick up the phone.
Crane type is one of the fastest reads you get from the street, and most reps already use it without putting words to it. Worth putting words to it, because the read changes what you say when you call.
Tower crane: structure is underway, and it's going to stay underway
A tower crane is a commitment. Nobody erects one for a two-week job. If it's up, the GC has already poured a foundation or mat slab deep enough to anchor it, and they're planning months of vertical lifts, steel, precast, rebar cages, formwork. That's mid-structure, heading toward topping out.
For a rep selling concrete, rebar, or embedded hardware, a tower crane going up is close to your last call, not your first. It means the structural package is already let. If you're selling curtain wall, MEP rough-in materials, or interior fit-out gear, a standing tower crane is actually your green light. Structure's moving, which means the fit-out trades are three to six months out and the GC is starting to think about who's next in the sequence.
A tower crane coming down, the operator derigging it, jib sections on a flatbed, tells you the opposite. Structure's basically done. That's your cue to shift the pitch from rebar to drywall board, paint, flooring, and the stuff that shows up once the building's weathertight.
Mobile crane vs crawler crane: usually not structure, usually something else
A mobile crane, the kind that drives in on its own wheels, sets a load, and drives back out, is a different animal. It shows up for a day or a week, not a season. Seeing one on a slab or near a footing often means precast panel sets, equipment drops like rooftop units or generators, or steel erection on a smaller building that never needed a tower crane at all. On a low-rise job, a mobile crane picking steel beams is your structural phase, full stop, just without the tower.
Crawler cranes split the difference. They're the ones you see on tracks instead of tires, usually parked for weeks at a time doing heavy pile driving, deep foundation work, or big single lifts on industrial and infrastructure jobs. A crawler crane early on a site, before there's much of a building to see, almost always means deep foundations or shoring, which puts you in groundworks territory: excavation contractors, shoring material, dewatering gear. A crawler crane later in the job, next to a half-built structure, usually means it's there for one oversized lift, a transformer, a cooling tower, a big piece of equipment, and it'll be gone in days.
Tower crane up means sustained vertical structure work, likely months of it. Crawler crane means either deep foundations early or a one-off heavy lift later; read the rest of the site to tell which. Mobile crane means a short job, often structural steel or equipment sets on a building that isn't tall enough to need a tower.
None of this replaces walking the fence line or asking the super. But if you're planning a route across twenty sites and you can only see them from the road or from an aerial shot, crane type gets you most of the way to knowing which ones are worth a stop this week.
That's the gap a tool like Plant On Site is built for: reading what's parked and stacked across a whole list of addresses, cranes included, and sorting sites into groundworks, structure, or fit-out so you're not cold-calling the whole list on the same day regardless of where each one sits in the build.
If crane-spotting from the truck has been your method so far, it might be worth seeing what the same read looks like across every site on your list at once.